5 min read 428AM Engineering

Cloud migration without the 2am page: a pre-flight checklist for Philippine SMBs

Six things to lock down before a weekend cutover — credentials, data, rollback, monitoring, comms, and the human handoff.

  • Cloud Migration
  • AWS
  • Azure
  • GCP

Most weekend cutover disasters are not infrastructure failures. They're missing paperwork — un-rotated credentials, no rollback runbook, missing observability, or no one on call. Here's the six-item checklist we run through with every client before a Saturday-night cutover.

1. Credentials and access

2. Data migration verification

Don't trust 'the sync finished.' Verify with row counts, checksums on critical tables, and a parallel read window before cutover.

3. Rollback runbook (in writing)

Every cutover must have an exit criterion: if X happens by 23:00, we roll back. Decide this BEFORE Saturday, not at 23:00.

4. Monitoring and alerting

5. Communications plan

Who tells your customers, when, and how? The best cutovers announce a maintenance window in advance; the worst leak via 'why is the site down?' tweets at 22:30.

6. The human handoff

How we run cutovers

428AM does weekend cutovers for Philippine SMBs moving from on-prem or shared hosting to AWS, Azure, or GCP. Cost-aware design (we scope to your workload, not to the cloud provider's upsell), 30 days on-call after, written runbooks your team actually reads. Timeline for a typical cutover: 4-10 weeks of prep, one weekend of execution.